Blasting Coverage Calculator
Estimate media consumption and time for wet abrasive blasting operations.
Formula
Consumption = nozzle output / (travel speed × blast width). Total time = area / (speed × width).
Variables
- Area — total surface area to blast (m²)
- Nozzle output — media flow rate from nozzle (kg/h)
- Travel speed — nozzle travel speed (m/h)
- Blast width — effective blast pattern width (m)
Example
500 m² tank shell, nozzle 200 kg/h, speed 10 m/h, width 0.5 m: coverage = 5 m²/h, consumption = 40 kg/m², total media = 20,000 kg, time = 100 hours.
Application
Useful for estimating media procurement, blasting time and crew scheduling for wet abrasive blasting of tanks, structural steel and industrial surfaces.
Limitations
Actual consumption depends on surface condition, profile requirements, operator technique and blast pressure. This is a preliminary estimate for planning purposes.
Need engineering support for this calculation?
Request Engineering ReviewContextual enquiry · no obligationPreliminary calculation only. Not a certified engineering design. Final design must be validated by a qualified professional where required.